This board offers a timeless method of spelling out personalized statements in an outdoor sheltered area. The letter board surface contrasts with the white letters, making messages pop and easier for people to notice. The traditional design of the frame also alerts those passing by that the board contains crucial information, giving direction to the public. Each board features a shatter-proof acrylic panel within the lockable door mounted on full-length piano hinges (two keys are included).
Boards & Easels,Enclosed Boards
24x36 1-Door Enclosed Lighted Outdoor Letterboard,Black Felt/Satin
Specifications of 24x36 1-Door Enclosed Lighted Outdoor Letterboard,Black Felt/Satin | |
---|---|
Category | |
Instock | instock |